American-bath-factory Neo Supreme Carolina Shower Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Accessoires pour l'eau American-bath-factory Neo Supreme Carolina Shower. American Bath Factory Neo Supreme Carolina Shower User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 4
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
GLASS DOOR & PANEL INSTALLATION
14
!
CAUTION
Glass is tempered, very strong, and impact resistant, but its weakest point is impact on edges and corners.
Do not rest edges of glass on hard surfaces.
Tempered glass cannot be cut
1
hinge pin
side plate
diagram 2
side plate
hinge pin
shower
inside
shower
outside
teflon slide washer
teflon slide washer
Note: Two people are required for this installation. Take careful measurements before
cutting or drilling products.
A - Handle Installation
1. Set the glass door in a position to enable the assembly of the handle. (diagram 1)
2. Loosen the set screws so you can separate the handles.
3. Unscrew the long bolt from the handle. Keep all rubber pieces attached to the screw.
4. Remove the first set of flat, clear washers from the bolt.
5. Start with the top hole on the glass door. Place the long bolt through the hole in the door
(keeping the remaining rubber pieces on the bolt). On the other side of the glass place the flat
washers onto the threaded portion of the bolt. (diagram 1)
6. Take one side of the handle and screw the long bolt into the end. Just start the bolt until a few
threads catch. Keep loose. (diagram 1)
7. Put the second bolt through the lower hole. Place the flat washer onto the bolt. Screw the bolt
into the bottom handle. (diagram 1)
8. Align the handle on the door and carefully tighten the long bolts. Do not over tighten.
9. Place the opposite handle over the long bolts and tighten the set screws to secure the handle.
B - Hinge Installation
1. Locate the top hinge and remove the side plate by loosening the two screws. (diagram 2)
2. Place the hinge into the top cutout on the door so the screws will be facing into the shower
and install the side plate. Tighten the screws until the hinge is secure. Make sure the hinge is
centered in the cutout and that the screws are facing into the shower. (diagram 2)
Be careful not to rest the edges of the door on hard
surfaces. Tempered glass is very strong and impact
resistant but its weakest point is impact on the edges.
diagram 7
clear washer
clear spacer
clear washer
set screw
shower
inside
shower
outside
carolina
neo
Vue de la page 0
1 2 3 4

Résumé du contenu

Page 1

GLASS DOOR & PANEL INSTALLATION14! CAUTIONGlass is tempered, very strong, and impact resistant, but its weakest point is impact on edges and

Page 2 - C - Glass Panel Installation

NEO GLASS DOOR & PANEL INSTALLATION (continued)2C - Glass Panel Installation 1. Carefully lift the glass panels and set them into the side and p

Page 3 - D - Dry Fit Door/Header

NEO GLASS DOOR & PANEL INSTALLATION (continued)3diagram 6diagram 7glass channelside section side sectioncenter sectionhinge pinholehinge pinhole

Page 4 - F - Door Seal Installation

NEO GLASS DOOR & PANEL INSTALLATION (continued)4diagram 9diagram 121/4” gap3/8”door to pan thresholdclearanceshower pantop of shower pan threshold

Commentaires sur ces manuels

Pas de commentaire